AIRPORT CONSTRUCTION

TAB is continually extending its forces to the expansion of McCarran International Airport by completing projects that included mass excavation, grading, paving, utility work, and concrete paving.

T-3 Directional Roadway Signage
T-3 Directional Roadway Signage
Construction of new directional roadway signage for the McCarran International Airport

VIEW DETAILS


Terminal 3 Roadways
Terminal 3 Roadways
TAB installed the wet utility package for the infrastructure of the new Terminal 3 Roadways at McCarran Airport in Las Vegas.

VIEW DETAILS


Taxiway C & D - Gate Inner Ramp Reconstruction
Taxiway C & D - Gate Inner Ramp Reconstruction
Placement of approximately 238,000 square yards of new crushed aggregate base course and Portland cement concrete pavement

VIEW DETAILS


Terminal 3 Apron
Terminal 3 Apron
The project included demolition of asphalt pavement, Portland Cement Concrete Pavement, chain link fence, apron edge lighting and underground structures.

VIEW DETAILS


Cluster Building Number Four Ramp Rehabilitation
Cluster Building Number Four Ramp Rehabilitation
The scope of work included the reconstruction of apron pavement, grading and drainage and an update of the aircraft fueling system.

VIEW DETAILS


Cluster Building Number Two Ramp Rehabilitation
Cluster Building Number Two Ramp Rehabilitation
TAB Contractors was hired to provide all materials and labor for construction of the apron. The work included demolition of the existing asphalt, (PCCP), existing utilities, electrical and site miscellaneous items, mass excavation and dirt work.

VIEW DETAILS


Satellite C Paradise Pad Apron
Satellite C Paradise Pad Apron
The project includes removal and replacement of existing fuel, water, sewer, storm drain, blast walls and fuel shutoff systems. Tab will also upgrade equipment and materials.

VIEW DETAILS


I-215 Airport Connector, Phase I
I-215 Airport Connector, Phase I
The project will widen the existing 1-215 Freeway by providing one additional basic lane in each direction between 1-15 and Windmill Lane and auxiliary lanes to improve operations.

VIEW DETAILS


Sands Hangar Apron Improvements
Sands Hangar Apron Improvements
Portland concrete cement pavement and fuel line work

VIEW DETAILS



PLAN ROOM| CAREERS| FAQ| MAPS| LINKS| PRIVACY
6600 Amelia Earhart Ct. #B • Las Vegas, NV 89119
nclasvegas.com • 702 642 3331
© Copyright 2010 New-Com Inc.
Click Here To Visit Our Twitter Page Click Here To Visit Our Facebook Page