New-Com Inc., The Consolidated Parent Company of TAB Contractors, MMC Inc. and ACME Electric
EMPLOYEE LOGIN: SIGN IN
HOME COMPANIES SAFETY ABOUT SERVICES CONTACT PLAN ROOM

ACME Electric, Specialty Electrical Contractors
MMC Inc., A Leader in Water/Wastewater Construction
TAB Inc., Heavy Civil Contractors and Underground Wet Utilities Construction


Client Projects
Hover over one of the logos below to view project lists.







LAS VEGAS WASH MIDDLE BRANCH STORM DRAIN
Back To Projects


Las Vegas Wash Middle Branch Storm Drain Installation
This project included the installation of a new storm drain facilitiy constructed with 66 inch to 96 inch reinforced concrete pipe and a 7 x 6 foot reinforced concrete box. TAB also installed storm drain inlets, manholes and reconstructed and restripped the existing pavement affected by new storm drain facilities.

DATE OF COMPLETION:

CLIENT:

CONTRACT TYPE:

ENGINEER:

LOCATION:

VALUE:

2010

City of Las Vegas

Design-Bid-Build

VTN

Las Vegas, NV

$3 Million



PHOTO GALLERY:
Las Vegas Wash Middle Branch Storm Drain Installation
Reinforced Concrete Pipe
Setting The Storm Drain

PLAN ROOM| CAREERS| FAQ| MAPS| LINKS| PRIVACY
6600 Amelia Earhart Ct. #B • Las Vegas, NV 89119
nclasvegas.com • 702 642 3331
© Copyright 2010 New-Com Inc.
Click Here To Visit Our Twitter Page Click Here To Visit Our Facebook Page