New-Com Inc., The Consolidated Parent Company of TAB Contractors, MMC Inc. and ACME Electric
EMPLOYEE LOGIN: SIGN IN
HOME COMPANIES SAFETY ABOUT SERVICES CONTACT PLAN ROOM

ACME Electric, Specialty Electrical Contractors
MMC Inc., A Leader in Water/Wastewater Construction
TAB Inc., Heavy Civil Contractors and Underground Wet Utilities Construction


Client Projects
Hover over one of the logos below to view project lists.







TERMINAL 3 APRON
Back To Projects


Terminal 3 Apron Construction at McCarran Airport

Terminal 3 Apron Under Construction
The Terminal 3 Apron project is a portion of the civil component associated with the construction of the new 14-gate Terminal 3 Building at McCarran International Airport. The project includes site excavation, placement of PCC and batch plant operations, placement of aggregate base, demolition of asphalt pavement, Portland Cement Concrete Pavement, chain link fence, apron edge lighting utility installations, construction of drainage facilities and underground structures. Underground utility installations include subgrade preparation, water, sewer and gas lines. An underground jet fuel delivery system consisting of pipelines, valve vaults, hydrant pits and EFSO vault and tie-ins to existing fuel system. New electrical, communication duct banks, apron taxi lane centerline lighting are required. Apron lighting will also include high mast lighting for new equipment parking areas.

DATE OF COMPLETION:

CLIENT:

CONTRACT TYPE:

ENGINEER:

LOCATION:

VALUE:

In Progress

Department of Aviation

Design-Bid-Build

PBS & J

Las Vegas, NV

$13 million



PHOTO GALLERY:
Portland Cement Concrete Pavement

PLAN ROOM| CAREERS| FAQ| MAPS| LINKS| PRIVACY
6600 Amelia Earhart Ct. #B • Las Vegas, NV 89119
nclasvegas.com • 702 642 3331
© Copyright 2010 New-Com Inc.
Click Here To Visit Our Twitter Page Click Here To Visit Our Facebook Page