WATER TREATMENT FACILITY CONSTRUCTION
MMC has been heavily involved with the construction of water treatment facilities, builiding over ten facilities in the past thirty years.
Timpanogos Plant Expansion
Construction included rehabilitation, modification and expantion of The Timpanogos Wastewater Treatment Plant.
VIEW DETAILS
Corrosion Management Phase 2
Scope of work includes, but is not limited to, rehabilitation of concrete in 90-foot dia. Flow Equalization Basin #’s 1 and #2 and existing Aluminum Floc Clarifier.
VIEW DETAILS
Central Plant ERW PS & 66 Inch FM Rehab
Installation of 150 feet of 20-inch discharge pipe and two disinfection metering pumps; rehabilitation of existing surge ponds; replacement of an electrical load center, motor control center and other electrical equipment.
VIEW DETAILS
T3 Sterilizer
Construction of a steam sterilization facility to treat waste from international flights.
VIEW DETAILS
WPCF Sludge Blending & Feed Station
Construction of a new sludge blending tank and blended sludge pump station.
VIEW DETAILS
Solids Dewatering Facility
This project included construction of a 182 MGD solids dewatering facility with a design capacity to accommodate solids produced from an average/peak flow of 150/192 MGD.
VIEW DETAILS
CCWRD South Secondaries
Construction includes four aeration basins, four secondary clarifiers, an RAS pump station and a mixed liquor splitter all cast-in-place concrete with equipment and piping
VIEW DETAILS
Arsenic Treatment Facility
This plant was designed to remove arsenic from the groundwater using a coagulation-filtration process with chemical addition.
VIEW DETAILS
City of North Las Vegas Water Reclamation Facility
New-Com and subsidiaries are acting as the Construction Manager at Risk for the construction of a brand new 25 MGD water reclamation facility for the City of North Las Vegas.
VIEW DETAILS
Biological Nutrient Removal Contract No. 23
MMC was involved in the expansion of the existing plant. During construction it was determined that a number of the electrical controls and instrumentation did not interface with the existing plant.
VIEW DETAILS
Desert Breeze Water Resource Center
MMC was resposible for the construction of a pipeline from the Twain Interceptor to the DBWRC, primary and secondary treatment facilities.
VIEW DETAILS