Acme Electric, Specialty Electrical Contractors
MMC, A Leader in Water/Wastewater Construction
TAB Contractors, Heavy Civil Contractors and Underground Wet Utilities Construction

Click the map below to view our projects.
Click the map below to view our projects.

WATER TREATMENT FACILITY CONSTRUCTION

MMC has been heavily involved with the construction of water treatment facilities, builiding over ten facilities in the past thirty years.

Timpanogos Plant Expansion
Timpanogos Plant Expansion
Construction included rehabilitation, modification and expantion of The Timpanogos Wastewater Treatment Plant.

VIEW DETAILS


Corrosion Management Phase 2
Corrosion Management Phase 2
Scope of work includes, but is not limited to, rehabilitation of concrete in 90-foot dia. Flow Equalization Basin #’s 1 and #2 and existing Aluminum Floc Clarifier.

VIEW DETAILS


Central Plant ERW PS & 66 Inch FM Rehab
Central Plant ERW PS & 66 Inch FM Rehab
Installation of 150 feet of 20-inch discharge pipe and two disinfection metering pumps; rehabilitation of existing surge ponds; replacement of an electrical load center, motor control center and other electrical equipment.

VIEW DETAILS


T3 Sterilizer
T3 Sterilizer
Construction of a steam sterilization facility to treat waste from international flights.

VIEW DETAILS


WPCF Sludge Blending & Feed Station
WPCF Sludge Blending & Feed Station
Construction of a new sludge blending tank and blended sludge pump station.

VIEW DETAILS


Solids Dewatering Facility
Solids Dewatering Facility
This project included construction of a 182 MGD solids dewatering facility with a design capacity to accommodate solids produced from an average/peak flow of 150/192 MGD.

VIEW DETAILS


CCWRD South Secondaries
CCWRD South Secondaries
Construction includes four aeration basins, four secondary clarifiers, an RAS pump station and a mixed liquor splitter all cast-in-place concrete with equipment and piping

VIEW DETAILS


Arsenic Treatment Facility
Arsenic Treatment Facility
This plant was designed to remove arsenic from the groundwater using a coagulation-filtration process with chemical addition.

VIEW DETAILS


City of North Las Vegas Water Reclamation Facility
City of North Las Vegas Water Reclamation Facility
New-Com and subsidiaries are acting as the Construction Manager at Risk for the construction of a brand new 25 MGD water reclamation facility for the City of North Las Vegas.

VIEW DETAILS


Biological Nutrient Removal Contract No. 23
Biological Nutrient Removal Contract No. 23
MMC was involved in the expansion of the existing plant. During construction it was determined that a number of the electrical controls and instrumentation did not interface with the existing plant.

VIEW DETAILS


Desert Breeze Water Resource Center
Desert Breeze Water Resource Center
MMC was resposible for the construction of a pipeline from the Twain Interceptor to the DBWRC, primary and secondary treatment facilities.

VIEW DETAILS



PLAN ROOM| CAREERS| FAQ| MAPS| LINKS| PRIVACY
6600 Amelia Earhart Ct. #B • Las Vegas, NV 89119
nclasvegas.com • 702 642 3331
© Copyright 2010 New-Com Inc.
Click Here To Visit Our Twitter Page Click Here To Visit Our Facebook Page