SOLIDS DEWATERING FACILITY
Back To Projects


Solids Dewatering Facility Under Construction

Solids Dewatering Facility
This project included construction of a 182 MGD solids dewatering facility with a design capacity to accommodate solids produced from an average/peak flow of 150/192 MGD. A new sludge transfer pump station was constructed at the central plant, consisting of wet wells for primary and thickened waste activated sludge, six processing cavity pumps and associated piping and controls, covered with a sun shade. The transmission pipelines cross under the Las Vegas wash via micro-tunneling. In addition to the sludge pipelines, there are centrate, sanitary sewer, water, reclaimed water and electrical lines installed between the pumping and dewatering facilities. The Solids Dewatering Facility includes two 376,000 gallon storage tanks for primary and thickened waste activated sludge, cavity centrifuge feed pumps, eight high solids centrifuges and a dewatered cake conveyance system.

DATE OF COMPLETION:

CLIENT:

CONTRACT TYPE:

ENGINEER:

LOCATION:

VALUE:

2010

Clark County Water Reclamation

Design-Bid-Build

CH2M Hill Engineering Inc.

Las Vegas, NV

$128 million



PHOTO GALLERY:
Solids Dewatering Facility, MMC
Foul Air Pipe Infrastructure
Solids Dewatering Facility Pumping Station
Transmission Pipelines
Processing Cavity Pumps

PLAN ROOM| CAREERS| FAQ| MAPS| LINKS| PRIVACY
6600 Amelia Earhart Ct. #B • Las Vegas, NV 89119
nclasvegas.com • 702 642 3331
© Copyright 2010 New-Com Inc.
Click Here To Visit Our Twitter Page Click Here To Visit Our Facebook Page