MMC was hired for the removal of the Biological Nutrient Pumping Station, four BNR aeration basins, four secondary clarifiers, RAS and WAS pumping stations. There was also an installation of additional blowers and controls. Services also included additions to the existing plant with a centrifuge expansion. Electrical controls and instrumentation were upgraded to insure proper interface.
DATE OF COMPLETION:
CLIENT:
CONTRACT TYPE:
ENGINEER:
LOCATION:
VALUE:
November, 2002
City of Las Vegas
Design-Bid-Build
HDR Engineering Inc.
Las Vegas, NV
$26 million