Scope of work includes, but is not limited to, rehabilitation of concrete in 90-foot dia. Flow Equalization Basin #’s 1 and #2 and existing Aluminum Floc Clarifier. Remove, dispose and replace existing galvanized steel deck roof on Screening Building. Remove and dispose of existing galvanized steel HVAC ductwork and replace 8 existing evaporative coolers.
DATE OF COMPLETION:
CLIENT:
CONTRACT TYPE:
ENGINEER:
LOCATION:
VALUE:
In Progress
CCWRD
Design/Bid/Build
HDR Engineering Inc.
Laughlin, NV
5,000,000