Installation of 150 feet of 20-inch discharge pipe and two disinfection metering pumps; rehabilitation of existing surge ponds; replacement of an electrical load center, motor control center and other electrical equipment; and retrofit of submerged gearboxes at Central Plant Filters.
DATE OF COMPLETION:
CLIENT:
CONTRACT TYPE:
ENGINEER:
LOCATION:
VALUE:
In Progress
CCWRD
Design/Bid/Build
Brown and Caldwell
Las Vegas, NV
6,700,000