New-Com Inc., The Consolidated Parent Company of TAB Contractors, MMC Inc. and ACME Electric
EMPLOYEE LOGIN: SIGN IN
HOME COMPANIES SAFETY ABOUT SERVICES CONTACT PLAN ROOM

ACME Electric, Specialty Electrical Contractors
MMC Inc., A Leader in Water/Wastewater Construction
TAB Inc., Heavy Civil Contractors and Underground Wet Utilities Construction


Client Projects
Hover over one of the logos below to view project lists.







CAESARS PALACE HOTEL AND CASINO PROJECTS
Back To Projects


Site Utilities

Mass Excavation for Octavius Tower
The work performed at Caesars Palace included the mass excavation, grading, and paving for a new Octavius Tower, Augustus Tower, Parking Garage, East Connector, Colosseum, and Convention Center, as well as all site utilities. TAB performed excavation through cemented soils up to 30 ft deep. We also installed several thousand feet of new utilities, including an 57” sewer line at depths of over 40 feet within 10 feet of live traffic lanes, and some of the largest sewer lift stations in the valley. TAB was an integral part of the construction team on a very compact site, working constantly around existing utilities and an operating hotel/casino.

DATE OF COMPLETION:

CLIENT:

CONTRACT TYPE:

ENGINEER:

LOCATION:

May 2010

Harrahs

Design-Bid-Build

Bergman, Walls and Associates

Las Vegas, NV



PHOTO GALLERY:
Excavation For the Construction of New Towers at Caesars Palace
Site Utilities at Caesars Palace
Excavated Earth For Octavius Tower

PLAN ROOM| CAREERS| FAQ| MAPS| LINKS| PRIVACY
6600 Amelia Earhart Ct. #B • Las Vegas, NV 89119
nclasvegas.com • 702 642 3331
© Copyright 2010 New-Com Inc.
Click Here To Visit Our Twitter Page Click Here To Visit Our Facebook Page