New-Com Inc., The Consolidated Parent Company of TAB Contractors, MMC Inc. and ACME Electric
EMPLOYEE LOGIN: SIGN IN
HOME COMPANIES SAFETY ABOUT SERVICES CONTACT PLAN ROOM

ACME Electric, Specialty Electrical Contractors
MMC Inc., A Leader in Water/Wastewater Construction
TAB Inc., Heavy Civil Contractors and Underground Wet Utilities Construction


Client Projects
Hover over one of the logos below to view project lists.







NIKKI BEACH TROPICANA HOTEL NORTH ENTRANCE
Back To Projects


Valet Entrance

Brand New Asphalt With Stripping
TAB Contractors performed site demo, asphalt grading, concrete paving and the installation of site utilities to Nikki Beach, North Entrance of the Tropicana Hotel. Additionally, the successful cosmetic upgrade has been on schedule from the first day of construction.

DATE OF COMPLETION:

CLIENT:

CONTRACT TYPE:

ENGINEER:

LOCATION:

VALUE:

2011

Tropicana of Las Vegas

Design-Bid-Build

Lochsa

Las Vegas, NV

$500,000



PHOTO GALLERY:
Nikki Beach
Nikki Beach North Entrance
Grading In Progress
Asphalt Paving
Nikki Beach Gets A Cosmetic Upgrade

PLAN ROOM| CAREERS| FAQ| MAPS| LINKS| PRIVACY
6600 Amelia Earhart Ct. #B • Las Vegas, NV 89119
nclasvegas.com • 702 642 3331
© Copyright 2010 New-Com Inc.
Click Here To Visit Our Twitter Page Click Here To Visit Our Facebook Page