Construction included installation of boxes, conduit, pull tape and the relocatation of the pole line, on-site Embarq work to intercept and run conduit, boxes and pull tape between two existing services and a 61,400 foot trench.
DATE OF COMPLETION:
CLIENT:
CONTRACT TYPE:
ENGINEER:
LOCATION:
2009
M.J. Dean Construction
Design-Bid-Build
Klai Juba Architects
Las Vegas, NV