This project included a concrete encasement for a 300 PSI ductbank, a 50-150 PSI slurry backfill, conduit, fittings, pullbox installation, A\C replacement and a 5,400 foot trench.
DATE OF COMPLETION:
CLIENT:
CONTRACT TYPE:
ENGINEER:
LOCATION:
2008
Wynn Design and Development
Design-Bid-Build
Lochsa Engineering
Las Vegas, NV