This project included the installation of new light fixtures, adjustable frequency drives, new PLC and instrumentation and an up-grade of existing primaries. Additional conduits, bio-filters, blower motor and slide gates were implemented. The scope of the project also included all process equipment, related piping and controls and an odor control system.
Associated Electrical Scope Included:
• Installation of all new electrical and instrumentation of two new primary clarifiers.
• Removal and installation of electrical and instrumentation of twelve existing primary clarifiers.
• Installation of new adjustable frequency drives in existing motor control centers.
• Installation new electrical and instrumentation on two new RAS/WAS pumps.
DATE OF COMPLETION:
CLIENT:
CONTRACT TYPE:
ENGINEER:
LOCATION:
VALUE:
December 2009
Clark County Water Reclamation
Design-Bid-Build
Black and Veatch
Las Vegas, NV
$3.5 Million